ME · statewide rule · verified November 5, 2026
Maine septic setback requirements
In Maine, the septic tank must sit at least 50 ft and the drainfield at least 100 ft from a private well, the drainfield at least 20 ft from the house and 10 ft from the property line. Source: 10-144 CMR Ch. 241, §8, Table 8B ↗. Measure your lot below to see what clears and what does not.
Free lot check
Test your measurements against Maine minimums
Enter the distances you measured or read off the site plan. Leave unknown ones blank. Nothing is uploaded.
| Distance to | Septic tank | Drainfield |
|---|---|---|
| Private well | 50 ft | 100 ft |
| House / foundation | 8 ft | 20 ft |
| Property line | 10 ft | 10 ft |
| Surface water | 100 ft | 100 ft |
Rule notes
- Values are for first-time systems under 1,000 gallons per day; larger flows need more distance.
- Disposal field to a full basement is 20 ft; Table 8A can reduce the well distance based on how deep the well casing is sealed.
- Surface water = major water body or watercourse; a minor water body is 50 ft. Public water systems need 300 ft (field) and 150 ft (tank).
Citation: 10-144 CMR Ch. 241, §8, Table 8B · Maine Subsurface Wastewater Disposal Rules, Table 8B ↗ · Verified against the rule text on November 5, 2026. Spotted a change? Tell us.
Context
How Maine compares with other states
- Septic tank → private well: 50 ft is equal to the 50 ft median of 30 tracked states. It matches CDC's 50-ft siting guidance.
- Drainfield → private well: 100 ft is the largest required distance among the 31 states Dakiv tracks. It is stricter than CDC's 50-ft siting guidance.
- Septic tank → house: 8 ft is below the 9 ft median of 30 tracked states.
- Drainfield → house: 20 ft is above the 10 ft median of 32 tracked states.
- Septic tank → property line: 10 ft is the largest required distance among the 30 states Dakiv tracks.
- Drainfield → property line: 10 ft is the largest required distance among the 32 states Dakiv tracks.
- Septic tank → surface water: 100 ft is the largest required distance among the 25 states Dakiv tracks.
- Drainfield → surface water: 100 ft is the largest required distance among the 30 states Dakiv tracks.
Before you rely on a number
The permit office has the last word.
These are statewide minimums transcribed from 10-144 CMR Ch. 241, §8, Table 8B. Counties, health districts and local boards in Maine can require more, and special cases — public wells, shoreland, sensitive aquifers or larger flows — use other distances. Get the approved site plan or as-built for an existing system before you buy, build or add on.
Start with the state program listed in EPA's directory, then confirm the county or district office.
Open the Maine permit finderQuick answers
Maine septic setback questions
How far does a septic system have to be from a well in Maine?
Under 10-144 CMR Ch. 241, §8, Table 8B, the septic tank must be at least 50 feet from a private well and the drainfield at least 100 feet. These are statewide minimums for a private drinking-water well; public wells and local health departments can require more. CDC's national siting guidance is 50 feet.
How close can a septic tank be to a house in Maine?
The statewide minimum distance to the house or foundation is 8 feet for the septic tank and 20 feet for the drainfield. Check the notes on this page for basement, crawl-space or footing-drain cases, which often need more room.
How close to the property line can a septic system be in Maine?
Maine's statewide rule sets 10 feet for the tank and 10 feet for the drainfield from the property line. Easements, neighbouring wells and local ordinances can push the system further in.
How far must a septic system be from a lake or stream in Maine?
The statewide minimum to surface water is 100 feet for the tank and 100 feet for the drainfield. Shoreland, watershed and drinking-water-supply areas often carry larger buffers.
Can my county require larger septic setbacks than Maine's state rule?
Yes. These are statewide minimums. County health departments, districts and local boards can adopt stricter distances, and the permit office that controls your parcel has the final say. Use the permit finder to reach it before you buy, build or add on.